Project Profile: Floating Dock Removal - Portifino Inn, Redondo Beach, Ca


General Contractor: Hellinghame Marine

Project Scope

  • ADCCI has all approved insurance for work at waters edge and on the water
  • All removal had to be done further down the bay over the top of the sea wall.
  • Over 40,000 sq ft of floating docks were cut free, relocated via boat and then craned for removal from the water.
  • The pieces were removed using a job specific platform created and engineered to remove the fragile dock with minimal debris lost.
 

 