General Contractor: Hellinghame Marine
Project Scope
- ADCCI has all approved insurance for work at waters edge and on the water
- All removal had to be done further down the bay over the top of the sea wall.
- Over 40,000 sq ft of floating docks were cut free, relocated via boat and then craned for removal from the water.
- The pieces were removed using a job specific platform created and engineered to remove the fragile dock with minimal debris lost.
![]() |
